Beds are where a hotel guest spends most of their stay — and where a refurbishment budget is most often quietly overspent. Sourced through the usual chain of distributors, a hotel bed carries the markup of every hand it passed through before it reached your loading dock. Sourced direct from the factory, the price reflects the product, and the quality is checked before it ever ships.

1996
Sourcing since
100+
Factory partners
2,000
Rooms in a single project

What you get

Everything in and around the bed, specified to your brief and your standard:

Why buy hotel beds direct from the factory

The discount is the headline, but it is rarely the most valuable part. Buying direct removes the resellers between you and the maker, so the price tracks materials, labour and freight — not the length of the supply chain. On a 200-room refurbishment, that margin is large enough to fund an entire category. And because you speak to the people holding the production calendar, the lead time you are quoted is the real one.

The discount gets you in the door. Quality control and honest lead times are what protect the opening date.

Quality & safety — how we protect your project

Going direct only pays off if quality is controlled at the source. That is the work we do before a single container ships:

How it works

STEP 01

Brief

You tell us the spec, quantity, quality level and install date. We come back with the right factory and an honest price.

STEP 02

Sample & approve

A physical sample against the final spec. Nothing goes into production until you have signed it off.

STEP 03

Produce & inspect

Production runs to a calendar mapped to your opening, with inspection points along the way.

STEP 04

Ship & deliver

We manage container freight, customs and last-mile delivery — to the room, ready to install.

From a single suite to 2,000 rooms

Scale is a price lever, not a barrier. A single suite ships efficiently by air freight; a full property ships by the container for the best price per unit. Either way you get the same sourcing discipline and the same single point of contact from brief to handover.

Frequently asked questions

Can you supply for a single property or only large volumes?

Both — from a single suite to 2,000 rooms. Small projects ship by air freight; larger projects by the container for the best price per unit.

What does “contract-grade” mean for hotel beds?

Frames, foam density and fabrics built for commercial, high-rotation use and to meet hospitality fire-safety standards — not residential specifications.

How do you control quality when buying direct?

We approve a physical sample against the final spec, confirm materials in writing, and inspect at the factory during the production run — before the container ships.

Do you handle freight and customs?

Yes. We manage container shipping, customs and last-mile delivery, so you keep the price advantage of buying direct without the logistics load.

What are typical lead times?

Lead times come straight from the factory's production calendar — real numbers, mapped to your install date with a contingency week.